البرومبت المستخدم
هذا هو البرومبت الكامل الذي سنستخدمه مع صورة المشروع كصورة مرجعية (Reference Image). الكاميرا ثابتة تماماً على نفس زاوية صورة الريفرنس، والمشهد مقسوم إلى طبقتين: عالم ثابت (الطرق والمباني المحيطة والأفق والإضاءة)، وعالم حيّ لا يتوقف (السيارات والمشاة والأشجار والغيوم). يبدأ الفيديو والموقع فارغ، ثم الحفر والأساسات، فالهيكل الخرساني طابقاً بعد طابق، ثم الواجهات الزجاجية، وأخيراً إزالة الرافعات وتنسيق المحيط، لينتهي بالمبنى مطابقاً لصورة الريفرنس، مع مؤثرات صوتية واقعية بدون موسيقى.
Photorealistic architectural construction timelapse, 10 seconds. The reference image shows the completed building and defines the fixed camera view for the whole shot; the video ends on this same view. A fixed tripod camera films from the exact position, lens, framing and horizon of the reference image for the entire video; only the camera is still, never the scene. The scene has two layers. The fixed world stays in place: the plaza, roads, surrounding buildings, skyline, and the sun's position and time of day of the reference image. The living world never stops moving, from the first frame to the very last: everything in the reference image that naturally moves keeps moving at timelapse speed, each in its own way. Cars and buses stream along the roads as motion-blurred streaks, pedestrians flow across the plaza and sidewalks as soft blurred figures, street trees sway and flicker in the wind, clouds race across the sky with their shadows gliding over the scene, and any water, flags or birds present in the reference image move with them. The surroundings are a living street filmed in timelapse, never a still photograph. 0–1.5s: The video opens on the same view with the building completely absent: an empty, leveled construction site behind a hoarding fence where the building stands in the reference image, while traffic and people already move all around it. 1.5–3s: Excavation and foundations: rebar mats, formwork and concrete pours spreading across the footprint, tower cranes erected on site, tiny workers, excavators and trucks rushing in and out of the site gate. 3–6s: The concrete structure rises floor by floor from the ground: columns, core walls and slabs stacking upward, formwork and scaffolding climbing at the top edge, cranes swinging loads and growing with the building as the main tower reaches its full height while the lower horizontal volumes are built beside it, slab by slab. 6–8s: Glass curtain walls and facade elements are installed panel by panel from the lower floors upward, closing the bare structure, scaffolding coming down as each part is finished, reflections of passing clouds sliding across the new glass. 8–9.5s: The cranes are dismantled and removed, the fence comes down, paving is laid, and the new trees and landscape of the reference image appear progressively around the base. 9.5–10s: The completed building now matches the reference image exactly in design, materials, framing and light, while the timelapse keeps running all around it: traffic streams, people pass, trees sway and clouds keep drifting right up to the last frame. Each stage grows continuously and logically from the one before, with real construction physics: every element is built in place and carried by what lies beneath it. Photorealistic architectural photography, smooth accelerated timelapse with natural motion blur on everything that moves, stable locked camera, the final building identical to the reference image. Audio: realistic sped-up construction sound design only, matched to each stage, over a constant hum of passing traffic and city life that runs until the last second: excavator digging and soil being moved, concrete pump and mixer trucks, hammering and drilling, crane motors and steel clanks as the structure rises, glass panels clicking into place, then lively city ambience with traffic, footsteps and birds carrying on to the end. Purely diegetic sound, with no music.